• TSX-V: FDC

Key Lake Road

Forum’s Key Lake Road project comprises seven claims in four separate properties: Costco, Highrock, Karpinka, and Costigan, The properties are located south of Cameco’s Key Lake deposits, and are underlain by rocks that host all the known uranium deposits in the eastern Athabasca Basin. Most of the projects also host a major shear zone (the Key Lake Road Shear Zone) and/or associated cross-cutting structures.

Figure 1: Key Lake Road Area Projects The projects cover an area Projects: The projects cover an area 25 km from north to south, and along three main conductive zones over a 40 km width. Outcrops with associated uranium showings occur in the south end of the project, while the north end (nearest the Key Lake mine site) is covered by sand and with no outcrop. The road to the Key Lake mine site runs through the middle of these properties, allowing for good year-round access. Lodging is available at the Costigan Lake fishing lodge.


© 2017 Forum Uranium Corp.
All rights reserved.